Following the most recent Public Meeting, Barratt has been working with the Local Authority and Squibb Group, their demolition contractor, to prepare an appropriate demolition plan for Darwin Green, which has as little impact on existing residents and the wider environment and community as possible.

We can confirm that the demolition proposals for Phase 2 of Darwin Green have been submitted to Greater Cambridge Shared Planning as three separate applications in relation to the demolition works. To view the separate applications please click on the links below:

Application reference number: 07/0003/COND51A – Condition 51 – Construction and Environmental Management Plan (CEMP)

Application reference number: 07/0003/COND52E – Condition 52 – Construction Method Statement (CMS)

Application reference number: 07/0003/COND53 – Condition 53 – Construction Programme

Updates regarding the demolition will be posted on our website including revised dates and information on mitigation for noise and dust.

If you have any queries about demolition and the timings of this, please do email us at info@darwingreenconstruction.co.uk